top of page
SCHOOLHOUSE RENOVATION
KITCHEN
We decided to knock down the wall between the previous kitchen and dining room to create a new, much larger kitchen. We found out quickly that the wall was load-bearing, so we had a load-bearing beam installed to be able to move forward with kitchen plans. OOF!
FOYER
Because we bought this property as a duplex, there was an 8" concrete fire wall that ran straight down the middle of the property from the 2nd floor to the basement, separating each side. We began knocking down the wall in the foyer first.
BATHROOM 1 (upstairs)
bottom of page